Click Prime in the STarStation instrument controls cleansing or control
tabs to pressurize the system.
Leave the green air tubing connected between the Luminex 100/200 and the
Sheath Delivery System.
On the Sheath Delivery System front panel, disconnect the blue and white
tubing. Connect the blue tubing to the sheath in, connect the white tubing
to sheath out.
Power the unit off/on
Hit the Prime button on the Sheath Delivery System front panel.
Sheath fluid will pump from the Sheath Delivery System reservoir into
the 20L Sheath Box.
Note: To refill the Sheath Delivery System, reconnect the tubing according
to colour coding and hit the Prime button.

|